en
High temperature repair agent
High temperature repair agent

SD111 cast-iron repair agent

Brand: SANDAO
MOQ: 10 Pieces
Delivery time: 15 Day
SD111 cast iron repair agent is a high performance polymeric metal material obtained by a variety of alloy materials and modified heat resistant resin, which has high binding strength with metal; has wear and corrosion resistance and aging resistance; its application is widely applicable for repair and regeneration of various metal defects; cured material has high strength and can perform various mechanical processing.
Product Details

Describe

◆Product model: SD111 cast iron repair agent  ◆SD111 cast iron repair agent is a high performance polymeric metal material obtained by a variety of alloy materials and modified heat resistant resin, which has high binding strength with metal; has wear and corrosion resistance and aging resistance; its application is widely applicable for repair and regeneration of various metal defects; cured material has high strength and can perform various mechanical processing.

Apply

It is suitable for the repair of gray iron, ball iron and other casting defects and the repair of parts wear, corrosion and rupture. After repair, the color is basically the same as the substrate, with high strength, and excellent wear and corrosion resistance and aging resistance, and can carry out all kinds of mechanical processing together with the substrate.

the key technical indexes (At TA=25)

parameter

performance index

pigment

iron casting

mixed state

Paste

Density (g/cm3)

1.6

Compressor strength (Mpa) GB / T 1041-2008

977

Shear strength (Mpa) GB / T 7124-2008

189

Bending strength (Mpa) GB / T 9341-2008

324

Tensile strength (Mpa) GB / T 6329-2009

563

hardness

90

Operable time limit (min)

curing time

Curing time is required before full-load operation

working temperature (℃)

Maximum tolerance temperature (℃)

20~40

At 18h or 2h + 80℃ 1h

36h

-60~160

180

 Use method and matters needing attention

1. Surface treatment: rough the repaired surface and clean it with the cleaning agent.

2. Preparation: Mix A and B components A: B: 7:1 or volume ratio A: B: 4:1 and use them up within the specified operation time limit.

3.  Apply: apply the mixed material layer by layer to the parts to be repaired. The first layer should be compacted to make it fully infiltrated with the substrate. If the order after the need for mechanical processing, to leave an appropriate amount of processing allowance.

4. Curing: 20~25℃ curing for 8 hours can be machining, 24 hours later into use, if the temperature is low should be used heating or extended curing time to promote curing.

Request More Details

Please fill out the form below and click the button to request more information about